top of page
2016 Alsea River–Missouri Bend Project
A rebuild of Missouri Bend Boat Slide removed deteriorating creosote and pressure-treated lumber from the river replacing it with straight grain cedar slide boards and concrete cross-ties that do not leach harmful chemicals. This work was performed for BLM under an ODFW R&E Grant to maintain an existing angler access point on the Alsea River. Grant application and a significant portion of the work was performed by volunteer labor from the Association of Northwest Steelheaders–Mid-Valley Chapter.
Timeline of Project
2016 Alsea River Missouri Bend
Degraded Boat Slide
2013-01 Missouri Bend Park e
Degraded Boat Slide
2016 Missouri Bend
View down the slide with guide boards (left) and hand rail (right)
2016 Alsea River Missouri Bend
Degraded Boat Slide
bottom of page